Factory & Production Capability

Est. 1996 · 18,500 m² intelligent workshop · Annual capacity 200,000 m² engineering windows + 50,000 m² curtain wall systems

Inside the 18,500 m² intelligent workshop — real production floor footage

Engineering Production

From Aluminum Profile to Finished Project

Established in 1996, our 18,500 m² factory runs an intelligent workshop with a one-flow production line for aluminum windows, doors and curtain wall projects — processing 15,000–20,000 m² monthly for global delivery.

  • CNC cutting & punching machines — precision machining of 65–75 thermal-break profiles
  • Automatic adhesive applicator — uniform sealant bonding for IGU assembly
  • Corner crimping (cornerer) — strong 45° miter joints with multi-layer waterproofing
  • Hardware fitting — Siegenia / Roto multi-point locks and hinges
  • Performance testing — wind-pressure resistance, water & air tightness, sound insulation
  • Export packing — seaworthy packaging supporting FOB / CIF / DDP terms
Plan a Factory Audit
Workflow

Project Production Workflow

A proven 6-step workflow from drawing to container loading.

01 · Design

Shop drawings, wind-load calc, approval

02 · CNC Cutting

Double-head saw, ±0.1 mm

03 · Machining

Drainage, lock holes, gasket slots

04 · Assembly

Corner crimping, hardware fitting

05 · Glazing & QC

IGU install, 100% inspection

06 · Packing

Labeling, crate, container loading

CNC Machining — machining center in operation

Frame Assembly — workers at assembly stations

Glazing & IGU — vacuum lifter handling glass

Quality Inspection — 100% check before packing

Export Packing — strapping for container loading

Equipment

Key Production Equipment

Automatic Adhesive Applicator

Even sealant application for IGU and frame bonding, replacing manual brushing.

CNC Machining Center

Automatic punching and milling for hardware, drainage and glazing bead positions.

Glass & IGU Handling

Vacuum-lifter glass handling for insulated glazing unit installation.

Blinds Assembly Workshop

Honeycomb blind production — fabric welding, rail assembly, cordless & motor pre-wiring.

Quality Control

Dimension and workmanship checks, plus wind-pressure, water & air tightness testing.

Export Packing & Loading

Seaworthy packaging and container loading for worldwide delivery.

Virtual Tour

Real Footage from Our Nan'an Factory

A video walk through the workshop — material storage, production floor, assembly and finished orders.

Material Yard & Profile Storage

Outdoor material yard — aluminum profile stock ready for production

Vertical profile racks — systematic storage of extrusion bars

Bundled extrusions — graded profiles in the storage area

Profile warehouse — aluminum stock organized by series

Material preparation — workers sorting profiles on the workbench

Workshop Overview & Logistics

Workshop walk-through — one-flow production line overview

Factory exterior — the Nan'an production base

Interior corridor — materials staged along the line

Container loading — export packing area at the loading bay

Container loading — export packing area at the loading bay

Production Floor

One-flow line — profiles moving through processing

CNC machining center — precision equipment on the floor

CNC with coolant — machining center in continuous operation

Machine workstation — dedicated station for profile processing

Assembly table — window frames laid out for assembly

Assembly stations — workers fitting frames and hardware

Mobile carts — frames moving between stations

Transport carts — WIP frames staged on carts

Queueing racks — orders lined up for the next process

Blinds Assembly Workshop

Honeycomb production line — cellular fabric processing in the blinds workshop

Blind assembly & testing — rails, cords and operation checks

Blinds workshop footage — production process of our honeycomb blinds

Finished Windows & Warehouse

Finished frames — assembled windows in vertical racks

Glazed units — frames with IGU glass installed

Transport racks — finished windows ready for dispatch

Order stacks — completed orders awaiting container loading

1996
Factory established
18,500 m²
Intelligent workshop
200,000 m²
Annual engineering windows capacity
50,000 m²
Annual curtain wall capacity
15–20k m²
Monthly processing volume
60+
Professionals, 10–15 yrs avg experience
Project Cases

Benchmark Projects at Home & Abroad

High-end hotel, real estate, residential and commercial projects across Europe, Asia and beyond.

Welcome to Audit Our Factory

Online video factory tour or on-site visit — arrange within 48 hours.

Book a Visit WhatsApp Us